Thank you for your patience while we retrieve your images.
Taken 18-Nov-11
Visitors 24


15 of 27 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3888 x 2592
Original file size3.83 MB
Image typeJPEG
Color spacesRGB
Date taken18-Nov-11 14:38
Date modified18-Nov-11 14:38
Shooting Conditions

Camera makeCanon
Camera modelCanon EOS DIGITAL REBEL XTi
Focal length160 mm
Exposure1/1000 at f/5.6
FlashNot fired, compulsory mode
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 200
Metering modePattern
Firestone Building Products

Firestone Building Products

MEC 350 shoves up the hill into the building at Firestone Building Products in Bristol, CT to retrieve 3 coil cars. The plant is accessed via The Terryville Loop Track which exclusively serves and ends at Firestone.

Friday, November 18, 2011 1337 hrs.